KEMPEROL 2K PUR PDF

KEMPEROL 2K-PUR is a two-component, UV-stable high performance seamless and self-terminating cold fluid-applied polyester reinforced solvent-free. KEMPEROL 2K-PUR Speedshot combined with KEMPEROL 2K-PUR is the ideal solution for all applications where speed is essential. These include balconies. KEMPEROL® 2K-PUR is a solvent-free and odourless, fully reinforced, polyurethane resin-based liquid waterproofing system. It is ideal for use on sustainablility.

Author: Dajora Kazralkis
Country: Gabon
Language: English (Spanish)
Genre: Life
Published (Last): 7 May 2009
Pages: 18
PDF File Size: 10.76 Mb
ePub File Size: 17.37 Mb
ISBN: 523-7-91400-300-1
Downloads: 74382
Price: Free* [*Free Regsitration Required]
Uploader: Fenrikazahn

This section is based on the products of Kemper System America, Inc. Kemper System is the global leader in kemperpl, liquid-applied, fully reinforced roofing and waterproofing, having invented the technology and holding the first patents. The company maintains subsidiaries across North America, Europe, and Asia.

The versatility and adaptability of all Kemperol membranes, combined with the professional technical support, delivers a long term, built-to-last solution for any waterproofing challenge.

Kemper System products provide the best peace-of-mind solutions for a lifetime of protection for your most valuable assets, applications include: The reinforced membrane system can be surfaced with traffic coatings, decorative coatings, aggregate surfacing coatings and other granular materials to achieve a desired function and appearance.

Provide a fully reinforced cold fluid-applied advanced polyurethane technology waterproofing membrane and flashing system, and all other ancillary waterproofing work including but not limited to installation of insulation, cover boards, overburden, sealants and metal work as specified. Edit if required to include a manufacturer’s recommended system not described. Manufacturer’s data sheets on each product to be used, including:.

Show including plans and details of cold fluid-applied two-component polyurethane waterproofing membrane system including membrane, penetration flashings, base flashings, and expansion joints size, flashing details, and attachment. For each product specified, two samples, minimum size 6 inches mm square, representing actual product, thickness, color, texture and surfacing. Certify products meet or exceed specified requirements.

Submit on site test reports of Substrate Moisture Content and Bond Strength test results as specified. Submit manufacturer warranty and pud forms have been completed in Owner’s name and registered with manufacturer. Company specializing in manufacturing kemperop products system specified with a minimum of 20 years of documented experience with applications in the United States. Company specializing in performing the work of this section with a minimum of 3 years documented experience and approved by system manufacturer for warranted membrane installation.

Membrane kemperop shall provide the services of a competent field representative on-site to provide the following inspections:. Job start inspection at the beginning of each phase of the project, to review special detailing conditions and substrate preparation. Periodic in-progress inspections throughout duration of the project to evaluate membrane and flashing application.

Final punch-list inspection at the completion of each phase of the project prior to installation of any surfacing or overburden materials. Warranty inspection to confirm completion of all punch list items, surfacing, and overburden application.

KEMPEROL┬« 2K-PUR Liquid Applied Solvent-Free and Odourless Waterproofing – Cold Roof System

Obtain all principal components of waterproofing system from a single manufacturer. Secondary products that are required shall be as recommended and approved in writing by the waterproofing system manufacturer. Upon request of the Architect or Owner, submit Manufacturer’s written approval of secondary components in list form, signed by an authorized agent 2, the manufacturer.

The following is one example of how a mock-up on a large project might be specified. When deciding kwmperol the extent of the mock-up, consider all the major different types of work on the project.

  EL SECRETO DE LAS RUNAS GUIDO VON LIST PDF

Provide a mock-up for evaluation of surface preparation techniques and application workmanship. Prepare and clean a 3 foot 0.

Test each area to verify that substrate preparation meets specified requirements. Tests shall include tensile bond strength and moisture content of substrate. Do not proceed with the work until test results and workmanship are approved by Architect. Maintain mock-up for quality control during the progress of the remaining work.

Ejot Srbija -specijalista u tehnologiji povezivanja. KEMPEROL 2K PUR

Coordinated with similar paragraphs in Part 3 of this specification. Delete the paragraph s not required. Delete if not required. Verify project compatibility with the membrane manufacture and ensure that all necessary components for the EFVM testing are included in the design. Notify the Architect of and conflicts prior to start of waterproofing work.

Field Quality Control Flood Test: Test shall be of a 24 hr. Any incidents of water entry shall be evaluated and all necessary repairs conducted, followed by an additional flood test until all repairs are completed successfully.

Convene a pre-roofing conference approximately two weeks before scheduled commencement of waterproofing system installation and associated work. Require attendance of installers of substrate construction kemeprol receive waterproofing, installers of work in and around waterproofing which must precede or follow waterproofing work including mechanical and electrical penetration, equipment openings, subsequent finish work, and the Architect, Owner, and waterproofing system manufacturer’s representative.

Review foreseeable methods and procedures related to waterproofing work, including set up and mobilization areas for stored material and work area. Tour representative areas of waterproofing substrates, inspect and discuss condition of substrate, penetrations and other preparatory work. Review structural loading limitations of deck and inspect deck for loss of flatness and for required attachment.

Review waterproofing system requirements, Drawings, Specifications and other Contract Documents. Review and finalize schedule related to waterproofing work and verify availability of materials, installer’s personnel, equipment and facilities needed to make progress and avoid delays. Review weather and forecasted weather conditions and procedures for coping with unfavorable conditions, including possibility of temporary roofing. Record conference including decisions and agreements reached.

Furnish a copy of records to each party attending. Store products in manufacturer’s unopened packaging with labels intact until ready for installation. Store materials off the ground or on pallets, under cover and in a cool, dry location, out of direct sunlight, in accordance with manufacturer’ s recommendations. Store roll goods horizontally on platforms sufficiently elevated to prevent contact with water and other contaminants. Do not use rolls that are wet, dirty or have damaged ends.

Materials must be kept dry at all times. Do not store materials in quantities that exceed design loads, damage substrate materials, hinder installation or kejperol. Follow manufacturer’s directions kenperol protection of materials prior to and during installation. Do not use materials that have been damaged to the point that they will not perform as specified. Fleece reinforcing materials must be clean, dry and free of all contaminants.

Store and dispose of solvent-based materials, and materials used with solvent-based materials, in accordance with requirements of local authorities having jurisdiction.

KEMPEROL 2K PUR

Maintain copies of all current SDS for all components on site. Provide personnel with appropriate safety data information and training as it relates to the specific chemical compounds to be utilized. Apply waterproofing in a timely manner in conjunction with work of other trades. Coordinate with other trades to avoid traffic over or against completed membrane surfaces. Coordinate with installation of drains as shown on Drawings, including flashing, and associated waterproofing work.

  BROTHER MFC 490CW SCAN TO PDF

Field Quality Control Tests of completed sections of waterproofing membrane shall be successfully completed before proceeding with protection layers and overburden. Schedule tests promptly to allow timely installation of protection layers. Maintain environmental conditions temperature, humidity, and ventilation within limits recommended by manufacturer for optimum results.

Do not install products under environmental conditions outside manufacturer’s absolute limits. Application of waterproofing membrane may proceed while air temperature is between 40 degrees F 5 degrees C and 90 degrees F 30 degrees C providing the substrate is a minimum of 5 degrees F above the dew point.

When ambient temperatures are at or expected to fall below 50 degrees F 10 degrees Cor reach 85 degrees F 30 degrees C or higher, follow Membrane System Manufacturer’s recommendations for weather related additives and application procedures. Ensure that substrate materials are dry and free of contaminants. Do not commence with the application unless substrate conditions are suitable. Contractor shall demonstrate that substrate conditions are suitable for the application of the materials.

Sealing of air intakes with activated carbon filters. Install filters in accordance with requirements and recommendations of the filter manufacturer. Seal filters at joints and against building exterior walls to prevent leakage of unfiltered air.

Sealing of doorways, windows, and skylights with duct tape and polyethylene sheeting to prevent leakage of air into the building. Erection and use of moveable enclosure s sized to accommodate work area s and stationary enclosure for resin mixing station.

Enclosure shall be field constructed or pre-manufactured of fire retardant materials in compliance with local requirements in accordance with requirements of the Owner or his designated Representative. Exhaust opening shall be sealed with activated carbon filter. Various Kemper warranties are available. Warranties range from limited materials warranties to limited materials and labor warranties with coverage for insulation, ballast, vegetated overburden and surfacing.

Insert the period required. Manufacturer’s Select Labor and Material Warranty: Such warranties generally ensure a more vested interest in the integrity of the installation. Insert 2 or 5 year installer warranty period as required. Kemper System America, Inc. Kemper System Canada, Inc. Requests for substitutions will be considered in accordance with provisions of Section 01 60 00 – Product Requirements.

Materials shall be products of a single manufacturer or items specified that are standard with manufacturer of cold fluid-applied polyurethane liquid resin roofing and waterproofing membrane and flashing system.

Roof liquid waterproofing – KEMPEROL 2K-PUR – KEMPER SYSTEM – Videos

Provide primers and other secondary materials that are produced or are specifically recommended by manufacturer of membrane waterproofing system to ensure compatibility. Delete the paragraphs that are not applicable. All times are approximate and depend upon air flow, humidity and temperature.

Solid to walk on: After 24 hours at 73 degrees F, 50 percent relative humidity. Solid to drive on: After 48 hours at 73 degrees F, 50 percent relative humidity with rubber pneumatic tires.

To be applied between hours after application at 73 degrees F, 50 percent relative humidity.

Author: admin